M7 Motorway
Road Surfacing and ContractingKilsaran resurfaced 12km of carriageway on the M7 Kildare bypass pavement scheme for Jons Civil Engineering Limited. This was completed using 15,000 tonnes of Hot Rolled Asphalt (HRA) incorporating 15% RAP (recycled asphalt) The use of 15% RAP in the HRA materials results in a reduction of 165 tonnes of CO₂ when compared with standard HRA. The overall project achieved a 21% reduction in carbon emissions.