Kilsaran resurfaced 12km of carriageway on the M7 Kildare bypass pavement scheme for Jons Civil Engineering Limited. This was completed using 15,000 tonnes of Hot Rolled Asphalt (HRA) incorporating 15% RAP (recycled asphalt) The use of 15% RAP in the HRA materials results in a reduction of 165 tonnes of CO₂ when compared with standard HRA. The overall project achieved a 21% reduction in carbon emissions.

Location: Leinster
 
Sector: Public
 
Products Used:
Roadsurfacing & Contracting:

Hot Rolled Asphalt (HRA)

Reclaimed Asphalt Pavement (RAP)

Main Contractor: Jons Civil Engineering Limited

Year of Completion: 2024

 